Trusted H&S Specialists

Document Writing Services

Service Information

What is it?

A complete Risk Assessment & Method Statement (RAMS) writing service for UK construction. ObeSafe produces plain-English, site-specific RAMS that identify hazards, set workable controls, and describe the step-by-step method—so you can brief your team, satisfy clients and inspectors, and keep work moving safely.
Deliverable: final, branded PDFs (no editing needed your side). If the job or site details change, ObeSafe updates the PDFs free of charge for that project.

Built for sole traders, SMEs and principal contractors who need credible, inspector-friendly RAMS that slot straight into CPPs, inductions and client portals.


Why You Need It

1️⃣ Meet legal & client expectations
Show you’ve identified significant risks and set proportionate controls, with a safe system of work your team can actually follow.

2️⃣ Practical, not generic
Controls and sequences matched to your tools, materials, permits and site constraints, easy to brief, easy to apply.

3️⃣ RAMS that align with your CPP
Consistent language, roles and controls so your RAMS, CPP and toolbox talks tell one story.

4️⃣ Save time & avoid rework
We capture the details quickly and return final, inspection-ready PDFs.

5️⃣ Free project/site tweaks
Change of plant, team, location or sequencing? We revise and resend for the duration of that project, no extra cost.


What You Get

Task-specific Risk Assessment(s): Final PDF, branded with your logo & version fields
Method Statement(s): Step-by-step safe system of work (setup execution close-out)
Hazards, risks & persons at risk clearly listed
Control measures following the hierarchy of control (eliminate substitute engineer admin PPE)
Residual risk rating and justification
Permits & prerequisites flagged (e.g., hot works, excavations, isolation/LOTO, lifting plans)
Plant, tools & materials list with key safety checks
Competence & supervision requirements (roles, tickets, briefings)
Environmental and public interface controls (dust/noise, spill response, segregation)
Emergency arrangements (first aid, fire, rescue, utilities)
Supervisor briefing notes + toolbox-talk pointers for quick delivery
Free project/site-specific revisions by ObeSafe for the life of the job

Common RAMS we deliver: work at height (ladders/towers/MEWPs/scaffold), lifting ops/cranage, plant & vehicle movement, temporary electrics/110V, hot works, cutting/grinding, silica dust, asbestos awareness (no disturbance), COSHH (cement, mortars, sealants, paints), manual handling, noise/vibration, excavations & services (overhead/underground), confined spaces (awareness), housekeeping & waste, weather, welfare & first aid.


Built for

– Subcontractors and principal contractors needing credible RAMS for client approval
– Teams working across multiple sites and main contractors
– Businesses gathering evidence for SSIP and pre-qualification portals


How it works (simple)

  1. Tell us the task(s): Scope, tools/plant, materials, location, duration, team, permits and any special constraints
  2. We write: Tailored Risk Assessment(s) and Method Statement(s) that fit your method and site
  3. You review: Confirm details; we revise free for project/site specifics
  4. Final issue: Branded PDFs ready to brief, upload and file

Ready to replace guesswork with clear, client-approved RAMS?

Order your RAMS pack: Final PDFs, site-ready, with free project-specific revisions handled by ObeSafe.

RAMS risk assessment method statement writing services

Order RAMS now. Final PDF Risk Assessments & Method Statements—plain-English, branded, inspection-ready, with free site-specific revisions.

From £199.00

To request a quote, please fill out the form below and a member of the ObeSafe team will be in touch to discuss your needs and provide a bespoke quote.

Do you need some help? Get in touch.

Related Services

Whats our clients say...